Electromagnetics & Electrification

Cogging torque and torque ripple optimisation for permanent magnet motors with surrogate models

The motor holds its torque target and still shudders at low speed. Sensitivity screening, response surfaces and a Pareto search find the slot, magnet and pole-arc changes that cut cogging without costing average torque, and a finite element check proves them.

Left, a colour field plot of a permanent magnet motor sector with stator teeth and magnets. Right, a loop from parameters to surrogate, Pareto and finite element check, a Pareto scatter and cogging waveforms before and after.
A motor sector field plot beside the chain from design parameters to a checked Pareto design.

Cogging torque optimisation finds the slot, magnet and pole-arc dimensions that make a permanent magnet motor run smoothly at low speed without giving up average torque. We build it around your existing finite element solver, with a sensitivity screen, a surrogate of stated range, a Pareto search and a validation record, so the geometry is settled before the lamination tooling and the magnet order.

The torque target is met and the motor still shudders at low speed, and in a quiet application the shudder is heard. Yu and colleagues open their study with the reason it matters: excessive cogging torque amplifies noise and vibration, so it has to be considered when motors with precise motion control are designed, and its influence is more pronounced at low speed. It is an inherent property of slotted motors and cannot be abolished entirely, only reduced. Waiting on the answer: the lamination tool, the magnet order, the noise target and the first prototype.

The geometric levers of cogging torque in a surface-mounted magnet motor: slot opening, magnet thickness and pole arc, with the torque waveform before and after A stator drawn as an unrolled strip with teeth and slots above an air gap and a row of surface magnets on the rotor. Brackets mark the slot opening between tooth tips, the magnet thickness and the pole arc. At the right a cogging torque waveform with a large amplitude is redrawn with a smaller amplitude, and below a set of slanted lines stands for skewing the stack as an alternative. A SURFACE-MOUNTED MAGNET MOTOR, UNROLLED, AND ITS COGGING TORQUE POLE ARC COGGING TORQUE ROTOR POSITION ALTERNATIVE: SKEW THE STACK 1 2 3 4 5
  1. Slot opening. Slotting makes the stator and the magnets interact, which is where cogging torque comes from. The slot opening was one of the four parameters in the response-surface study read for this article.
  2. Magnet thickness. The magnet thickness is a second structural parameter of that study, together with the pole arc coefficient. It also sets the magnet cost and the demagnetisation margin.
  3. Pole arc. The ratio of magnet arc to pole pitch. In the study it was raised from 0.82 to 0.9 in the selected design, together with changes to the other parameters.
  4. Cogging waveform. Excessive cogging torque amplifies noise and vibration, and it matters most at low speed. It is a property of slotted motors and cannot be abolished entirely, only reduced.
  5. Skew. Skewing the stator or the magnets is the classical alternative to reshaping, and it changes other performance measures too, so it belongs in the same trade-off rather than outside it.
The geometric levers of cogging torque, and the waveform before and after. Hover a number. Illustrative schematic.

Which dimensions move cogging torque?

Slotting makes the stator core and the magnets interact, and that interaction is the source. The levers are the geometry of the interaction: the slot opening, the magnet thickness and the pole arc, with the skew of the stack as the classical alternative. In the published study a sensitivity analysis picked the structural parameters with a significant effect on the torque performance, and four of them went into the search: the pole arc coefficient, the magnet thickness, the slot opening and a second slot dimension.

That screen is the first thing we run on a new motor, because it makes everything after it smaller. A search over four parameters needs far fewer finite element solves than a search over twelve, and the ranking itself is useful: it tells you which dimension the tolerance budget should protect.

How does a surrogate and a Pareto search find the design?

The study fits a response surface to each objective as a function of the selected parameters, so a candidate is evaluated by the surface, not by a finite element solve, and then uses the NSGA-II genetic algorithm to produce the Pareto solutions across the objectives. The solution with a higher average torque than the initial motor and the lowest cogging torque was chosen, and a new finite element model of that design was built and solved. The numbers below come from that full model.

A cogging torque optimisation as five stages: sensitivity, surrogate, Pareto trade-off, finite element check and prototype Five boxes in a row joined by flowing arrows: sensitivity analysis, a surrogate fitted to the response, a Pareto trade-off, a finite element check of the chosen design and a prototype with a tolerance study. Below, a plot of average torque against cogging torque where scattered candidate points drift onto a Pareto front curve. FROM A WIDE SEARCH TO A CHECKED DESIGN SENSITIVITYwhich few matterSURROGATEfit the responsePARETOtrade-offsFEM CHECKrerun the winnerPROTOTYPEand spread COGGING TORQUE AVERAGE TORQUE CHOSEN DESIGNaverage torque kept SPREAD AND BUILDtolerances, prototype 1 2 3 4 5
  1. Sensitivity. A sensitivity analysis identifies the structural parameters that have a significant effect on the torque performance, which cuts the complexity of the search.
  2. Surrogate. A response surface fits the functional relationship between those parameters and each objective, so the search does not run a finite element solve for every candidate.
  3. Pareto trade-off. A genetic algorithm (NSGA-II) gives the Pareto solutions across the objectives. The design chosen had an average torque above the initial motor and the lowest cogging torque.
  4. Finite element check. A new finite element model of the chosen design is built and solved, so the reported numbers come from the full model, not from the surrogate.
  5. Prototype and spread. The study itself is numerical. Its authors name robust design optimisation and experimental prototypes as future work, which is the stage where manufacturing spread has to be shown.
Sensitivity, surrogate, Pareto, finite element check and prototype: where the search narrows and where it is checked. Illustrative schematic.

What did the published study achieve?

The table gives the torque performance of the initial motor and of the designs from four ways of searching. The design the study proposes is the last row.

Torque performance of a surface-mounted magnet motor before and after optimisation, from the study's finite element results
DesignCogging torque, N mAverage torque, N mTorque ripple, %
Initial motor4.7728.4219.19
RSM and NSGA-II1.3729.3312.81
Taguchi method2.7435.1710.61
RSM alone1.2030.8112.27
RSM and NSGA-II, local refinement0.7828.8911.69

In our arithmetic on the table, the final design cuts cogging torque by 83.6 per cent, raises the average torque by 1.7 per cent and lowers the torque ripple by 7.5 percentage points. It got there by raising the pole arc coefficient from 0.82 to 0.9, thinning the magnet from 4.5 to 4.28 mm, widening the slot opening from 2 to 2.7 mm and adjusting a second slot dimension from 4.2 to 4.13 mm.

Read the other rows too. The Taguchi design has a much higher average torque and a cogging torque of 2.74 N m; the response surface alone sits in between. Each method lands at a different point of the same trade-off, which is why the choice of objective, and a clear statement of the constraint on average torque, comes before the choice of algorithm.

What has to be added before the design goes to production?

The study is numerical, and its authors say so: robust design optimisation and experimental prototypes are their future work. Those are the two steps we add. First, constraints the search must respect: a thinner magnet, as in the final design, is the kind of change that needs a demagnetisation check at the hot, high-current corner, and the temperature of the magnet comes from the loss-to-temperature chain in our motor thermal simulation article. Second, the spread: magnet and slot tolerances move cogging torque in production, so the chosen design is run through a tolerance study before it is trusted.

Cogging also feeds the noise story. Torque pulsation contributes to noise and vibration, and the e-NVH article follows that path from force to housing.

A cogging model is not a prototype measurement

Simulation does not replace the measurement of cogging torque and ripple on a built motor, the tolerance and manufacturing review, or your customer's acceptance. Predicted cogging depends on the geometry, the magnet and steel data, the mesh and the position steps, and it is sensitive to manufacturing deviations. The study above is numerical, and the improvement it reports is the improvement of a model. How far virtual evidence is accepted follows the risk of the decision. Nothing we build certifies a motor.

Where does machine learning earn its place?

In exactly the step the study uses it: replacing a finite element solve inside a search. The surrogate is trained on a designed set of solves, it answers inside its sampled range, it says when a candidate falls outside it, and the full model checks every design that is reported. Our surrogate-model article and validation article set out how we train and check them, and the generative design and optimisation page shows where the search methods fit.

From one motor to a design workflow your team keeps

The return comes when your engineers run the next slot count, magnet grade or torque target through the same chain.

From one simulation study to a permanent workflow A loop of six steps: physics model, validation, automated runs, AI surrogate, decision tool and field data, which feeds back into the physics model. YOUR WORKFLOW Better with every run physics + data + AI, kept in-house 1Physics model 2Validation 3Automated runs 4AI surrogate 5Decision tool 6Field data CFD · FEA TESTS · TRIALS DOE · HPC CLOUD OPTIMISE DECIDE MONITOR RECALIBRATE
  1. Physics model. CFD and FEA set up once, as templates: geometry clean-up, mesh, solver settings and post-processing that every later run reuses.
  2. Validation. Mesh and time-step studies, and comparison with tests or full-scale data, so the model's uncertainty is known before it is trusted.
  3. Automated runs. Scripted runs over the parameters and operating conditions that matter, on your hardware or in the cloud.
  4. AI surrogate. A machine-learning model trained on those runs answers in seconds and says how sure it is; low-confidence questions go back to the solver.
  5. Decision tool. Optimisation, trade-off charts or operating guidance, in a form your engineers and operators use every day.
  6. Field data. Test, trial and monitoring data flow back to recalibrate the model, so it improves with every project instead of being rebuilt.
Physics, validation, automation and AI in one loop that improves with every run. Illustrative schematic.
  • A parametric motor template: slot opening, magnet thickness, pole arc and skew as parameters, meshed the same way every time, checked on a case with a known answer.
  • A sensitivity screen: the parameters that move cogging torque, average torque and ripple, ranked, so the search is small.
  • A surrogate and a Pareto search with the trade-off shown, and the winner rerun on the full model.
  • Constraints that belong in the search: demagnetisation margin at the hot, high-current corner, magnet volume and the torque target.
  • A spread study: tolerance on magnet and slot dimensions against the cogging you will see in production.
  • A validation record: your measured cogging and ripple against the model, with tolerances set before the run.
  • Handover and training, so your team runs and extends it: our training and software development services.

What should you bring to a first conversation?

  • The motor: slot and pole count, stator and rotor geometry, winding, magnet grade and steel.
  • The targets: torque, speed range, the cogging and ripple you can accept, and the noise target.
  • The fixed constraints: outer diameter, magnet volume, tooling you cannot change.
  • Any measurement: cogging torque, ripple, back-emf or a torque map, even from a similar motor.
  • The decision waiting on the answer: a lamination tool, a magnet order, a prototype or a build date.

Common questions

What is cogging torque?
The torque a permanent magnet motor shows with no current, caused by the interaction of the magnets with the slotted stator. It cannot be abolished entirely, only reduced.
Is torque ripple the same as cogging torque?
No. Cogging comes from the slotting and exists without current; torque ripple is the variation of the torque under load, and cogging is one of its contributors.
Why not just skew the stack?
Skewing is a classical remedy and belongs in the same trade-off, because it changes other performance measures too. A search that includes it shows what it costs.
Can simulation replace a prototype?
No. It narrows what the prototype has to test and tells you which dimensions to protect. Sign-off stays with you and your customer.

If a lamination tool, a magnet order or a prototype is waiting on this, send us the motor geometry, the targets, the fixed constraints and any measurements you hold. We reply with the search we would set up, the validation we would run and what a surrogate could cover. Start with a conversation, or see our electrical motor design page. Related reading: electric motor thermal simulation and inverter thermal design.

OLTRION Engineering

CAE, CFD and simulation team

The OLTRION engineering team runs CFD, FEA and multiphysics simulation programmes for aerospace, automotive, energy and industrial clients, and builds the machine-learning tools that speed them up. These articles come from that project work.

Where this applies

Related capabilities

Have a model that will not converge?

Talk to the engineers who wrote this

Send the geometry, the physics and the decision it has to support. We answer with an approach, not a sales call.

Talk to an engineer